Project Information

The primary issue was a deteriorated water network prone to frequent interruptions and losses, unable to meet the growing personnel demand. Ensuring uninterrupted supply while improving sanitary quality was a dual priority.

Ideal Industries implemented a fully optimized water supply installation, securely connecting each camp housing unit using materials designed for durability and watertightness. The entire system minimized leakage and ensured reliable distribution. The outcome was a marked improvement in hygiene conditions, increased resident comfort, and a significant reduction in supply disruptions.

01

Client

MMG Kinsevere

03

Date

2023 (4 months)

02

Our Role

Art Direction

04

Category

Plumbing work

Scoope Of Work

Installation of the site's water system.

Plumbing work to connect water to the camp apartments.