Project Information

Faced with unstable terrain and significant environmental constraints, MMG needed to ensure a solid foundation for its future infrastructures at the OPS camp. Challenges included managing heterogeneous soil with high subsidence risk and efficiently transporting materials over a considerable distance.

Ideal Industries responded with precise excavation of 587 m³, deploying a reliable logistics system to transport materials 0.5 km, followed by meticulous grading and compaction of 904 m². These professional earthworks were calibrated to create robust platforms capable of supporting heavy loads while reducing deformation risks. The combined efforts enhanced site safety and internal circulation, establishing a durable foundation for sustainable site development.

01

Client

MMG Kinsevere

03

Date

2023 (3 months)

02

Our Role

Art Direction

04

Category

Planning

Scoope Of Work

Excavation works 587 m3 (Load and haul) and transportation (0,5 km)

Leveling and Compacting work in OPS CAMP (904 m2)

IMG-20250829-WA0069 vogue
IMG-20250829-WA0173
IMG-20250829-WA0158
IMG-20250829-WA0159