Project Information
Faced with unstable terrain and significant environmental constraints, MMG needed to ensure a solid foundation for its future infrastructures at the OPS camp. Challenges included managing heterogeneous soil with high subsidence risk and efficiently transporting materials over a considerable distance.
Ideal Industries responded with precise excavation of 587 m³, deploying a reliable logistics system to transport materials 0.5 km, followed by meticulous grading and compaction of 904 m². These professional earthworks were calibrated to create robust platforms capable of supporting heavy loads while reducing deformation risks. The combined efforts enhanced site safety and internal circulation, establishing a durable foundation for sustainable site development.
Client
MMG Kinsevere
Date
2023 (3 months)
Our Role
Art Direction
Category
Planning
Scoope Of Work
Excavation works 587 m3 (Load and haul) and transportation (0,5 km)
Leveling and Compacting work in OPS CAMP (904 m2)