Project Information

The EW site presented significant challenges in rapid and functional facility setup, with an almost complete lack of basic infrastructure. A major constraint was adapting modular structures to the specific needs of isolated site personnel while fully complying with hygiene standards.

Ideal Industries expertly converted two standard 40” containers into functional, modular spaces, optimizing interior layouts for maximum comfort. Installation of prefabricated sanitary units included proper ventilation and secure access, meeting strict hygiene requirements. Secure perimeter fencing was erected to ensure site safety. This project improved living conditions, reduced health risks, and enhanced the camp’s professional image.

01

Client

MMG Kinsevere

03

Date

2024 (2 months)

02

Our Role

Art Direction

04

Civil Engineering / Construction

Planning

Scope Of Work

Structure construction included 2 containers customizing (40’’)

2 Prefab toilet, customizing and installations

Fence installation at EW area

IMG-20250829-WA0071
IMG-20250829-WA0171
IMG-20250829-WA0072
IMG-20250829-WA0068